FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

<< Previous  Page 7 of 71  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>   All
 
601. Barkley lock emergency gate rehab
602. Cleveland harbor maintenance dredging
603. Small_business_information_uscg_silccon_acquisition_opportunities_fy19q4
604. Asphalt repair
605. Construction: hydronic piping iii at the oneill federal building in boston
606. Indefinite-delivery/indefinite-quantity (idiq) multiple award construction contract (macc), u.s. army installations within honshu, japan and yokota air base and its geographically-separated units (gsus), japan
607. Exterior envelope & roof at nasm-uhc
608. Reconstruct cave trails
609. Replace shake roof on 26 s. williams st
610. Replacement of san cristobal wood doors
611. Exterior repairs and tuck-pointing
612. Repair yurt at florissant fossil beds
613. Repair sewer lines
614. Rehabilitate visitor center sidewalk, primary and overflow parking and primary trailhead areas (deto 252588 / 252902)
615. Repair nw gravity sewer line
616. Repair airfield markings
617. Usda forest service athens, ga abatement services
618. Mark twain - erfo work
619. Wi erfo 2018 flood recovery 2
620. Wi erfo 2018 flood recovery 2
621. Facility renovation hot springs work center
622. 2019 modoc roof replacements
623. Santa fe nf - road resurfacing project
624. Tongass national forest exterior building improvements
625. Tongass national forest exterior building improvements
626. Wa-quinault nfh asphalt work
627. Rehab blackfooted ferret center
628. Mead substation stage 16
629. Screening information request/request for offer 1. replace 10’x16’shelter. 2. replace a vasi with a papi facility.
630. The federal aviation administration (faa) has a requirement to design the arsr exterior stairway with 4 options, including vertical access ladder, light in radome, exterior weatherproofing and new windows in alexandria, la.
631. The federal aviation administration (faa) has a requirement to design the arsr exterior stairway with 4 options, including vertical access ladder, light in radome, exterior weatherproofing and new windows in alexandria, la.
632. Bock 31 elevator modernization grand coulee dam
633. Repair roofs
634. Lower salmon river boat ramp improvements phase 1
635. Demolish latrine and re build in same bldg. 4621
636. Replace electrical distribution line, feeder k5
637. Repair sewer lines
638. Uscg driveway repair d17 repfac
639. Multi building earthquake repair
640. Vertical shop roof repair (b2350)
641. Repair exterior stair leaks-griffin terrace
642. Construction services for repair/alteration of office building - solicitation 140p2019r0068
643. Mowing 4,000 acres at midewin national tallgrass prairie
644. Salt plains roofing repair
645. Lead-based paint abatement requirement, for usda fsa springboro, pa
646. Generator maintenance
647. Repair/replace door closures & hardware, bldg. 8500
648. 19-1033c install automatic controlled gate system @ rod & gun club
649. Repair dorm b929 at osan ab
650. Demolition of building b140,141 & 142, cp walker, daegu korea
651. Total preventative maintenance, repair and cleaning services for army family housing (afh) at usag humphreys
652. Replace approach - threshold- end light fixtures
653. Fort worth, texas o&m services
654. Repair exterior leaks-griffin terrace
655. Repair exterior stair leaks-griffin terrace
656. Eagle pass cargo area walkway and import dock wood deck
657. Repair lift station in s-7045, usag humphreys
658. Replace ac units telephone switch room, vba, st petersburg, fl
659. Repair and minor renovation of squadron operations building 2215 at mountain home air force base, idaho
660. Bonneville auditorium & project office roof repair
661. Manatee harbor, maintenance dredging, 40- foot project, entrance channel, turning basin, and south access channel, manatee county, fl
662. Fy19 charleston harbor south jetty repair
663. Multiple breakroom refresh
664. Replacement electric distribution system
665. Eugene oneill nhs upgrade to new barn
666. Repaint exterior of train station at valley forge
667. Dormitory renovation project
668. Pool maintenance service
669. Usda forest service athens, ga abatement services
670. Lake sherwood lift station controls replacement
671. Facility renovation hot springs work center
672. Wa-quinault nfh asphalt work
673. Wa-quinault nfh concrete replacement
674. Rehabilitate & reslope dillin bottoms
675. Niip g7.5la pumping plant ventilation corrections
676. The central coast field offices clear creek decon
677. Building 202 fencing/gate removal and replacement
678. Maintain airfield runway
679. Repair 6000 area facilities
680. Hvac controls replacement phl atct
681. Fire alarm repair - berry rosenblatt afrc, 700 quaker lane south, w, hartford, ct 06110
682. Blanket purchase agreement for culvert cleaning for san juan national forest, pagosa ranger district roads.
683. Fish passage and traffic safety improvements
684. Ward lake trail ada improvements
685. Mill and overlay three acdess control points
686. Emergency collapsed sewer line rsc #73
687. Replace command post generator
688. B1020 repair tech training, sheppard air force base
689. Maintenance dredging, fairless turning basin, delaware river, philadelphia to trenton
690. Tampa harbor maintenance dredging, emergency bed leveling, 43-foot project cut c through gadsden point cut, hillsborough county, florida
691. Naval submarine base kings bay - entrance channel, maintenance dredging - cut-1n through range-e, 49,45, and 44-foot project, camden county georgia & nassau county e, florida.
692. Repair building 3004, schofield barracks, hawaii
693. Design/build milwaukee fire alarm life/safety project
694. Gsa anchorage, alaska federal building window replacement.
695. 642-13-204 |renovate building 1 7th floor behavioral health |eda: 10/03/19 | current milestone: pre-sol | status: accepted and assigned to cs. ees (05/24/19); non-actionable sow must describe what the contractor is to do. specs and
696. Shade structure renovation mcas yuma
697. Re-roof and paint the lighthouse apts, nps-pore
698. Re-roof and paint the lighthouse apts, nps-pore
699. Re-roof and paint the lighthouse apts, nps-pore
700. Re-roof and paint the lighthouse apts, nps-pore
<< Previous  Page 7 of 71  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>   All