FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

AMENDMENT TO SOLICITATION 36C24519Q0587 This is to answer the submitted questions and also to provide attached Past Performace Questionnaire (PPQ). - Attachment

General Information

Document Type:FILE
Posted Date:Sep 13, 2019
Category: Quality Control, Testing and Inspection Services
Set Aside:N/A

Contracting Office Address

Department of Veterans Affairs;Network Contracting Office 5 (NCO 5) 90C;NCO 5;510 Butler Avenue;Martinsburg WV 25405

Description

Questions for Solicitation 36C24519Q0587 Does the facility have an existing WMP for the potable water system? -Yes. Please confirm that the risk assessment, flow diagrams, and WMP formation is only for the utility cooling water system? -No potable and non-potable water as described in the statement of work. Which laboratory is currently providing the required legionella testing? -Phigenics. Is the facility utilizing any other data management system currently other than the VA legionella data archive spreadsheet system? -No. Describe the current water purification arrangement for example: filter, softener, SDI or RO, etc. -Boiler plant has a water softener and SPD utilizes a RO system. Who provides the ongoing maintenance and servicing of this equipment? -Inhouse staff. Is the facility currently conducting the required AAMI testing particularly the TIR 34 testing? -No Legionella lab analysis is typically a 10-14 day window of time. Will this be sufficient or does the result have to be within 10 days? -10 days from time the sample is received at the lab.

Original Point of Contact

POC Phillip.Duba@va.gov

Place of Performance

Link: FBO.gov Permalink
Link: FBO.gov Permalink
Link: FBO.gov Permalink
Bookmark This Notice
Print View