Unaccompanied Personnel Housing Joint Task Force Barracks at NS Guantanamo Bay, Cuba

General Information

Document Type:AWARD
Posted Date:Oct 01, 2019
Category: Construction of Structures and Facilities
Set Aside:N/A

Contracting Office Address

N69450 NAVFAC Southeast, Southeast Bldg. 903 Building 903 P. O. Box 30 NAS Jacksonville Jacksonville, FL

Description

Contract Award Date:†††††††††DTD 093019

Contract Award Number:††††CNT N6945019C1324

Contract Award Amount:†††††AMT 70864328

Contract Line Item Number:†LINE 0001-0005

Contractor:†††††TO RQ Construction, LLC (DUNS 966254349)<br />Firm-Fixed Price (FFP) Design-Build Construction Contract. Construct austere standard design barracks. Primary facilities include living and sleeping quarters (848 PN), information systems, fire protection and alarm systems, energy monitoring and control system connection. Work also includes special foundations, a substation upgrade, redundant power generator, water storage and pump station, a water treatment plant and Post Construction Award Services (PCAS). Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, storm drainage, information systems, landscaping and signage. The cost includes transporting all the construction materials/labor/equipment from the United States to Cuba and to provide temporary housing on site during the entire construction duration for the contractor ôs entire labor force and displaced troop personnel since there are no local alternatives. Heating and air conditioning will be provided by self-contained system. Facilities will be designed in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings. Facilities will be designed to the DoDs Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided if a requirement for remediation of environmental contamination arises during execution of this Barracks.|**|TO RQ Construction, LLC (DUNS 966254349)<br />Firm-Fixed Price (FFP) Design-Build Construction Contract. Construct austere standard design barracks. Primary facilities include living and sleeping quarters (848 PN), information systems, fire protection and alarm systems, energy monitoring and control system connection. Work also includes special foundations, a substation upgrade, redundant power generator, water storage and pump station, a water treatment plant and Post Construction Award Services (PCAS). Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, storm drainage, information systems, landscaping and signage. The cost includes transporting all the construction materials/labor/equipment from the United States to Cuba and to provide temporary housing on site during the entire construction duration for the contractor ôs entire labor force and displaced troop personnel since there are no local alternatives. Heating and air conditioning will be provided by self-contained system. Facilities will be designed in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings. Facilities will be designed to the DoDs Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided if a requirement for remediation of environmental contamination arises during execution of this Barracks.

Original Point of Contact

POC Sheila Borges, (904) 542-6207

Place of Performance

Link: FBO.gov Permalink
Bookmark This Notice