FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

DESOTO COUNTY, MS, ARKABUTLA LAKE DAM RECONSTRUCTION OF TOE DITCH FC/MR&T, YAZOO RIVER BASIN COLDWATER RIVER, ARKABUTLA LAKE

General Information

Document Type:PRESOL
Posted Date:Jan 24, 2020
Category: Construction of Structures and Facilities
Set Aside:N/A

Contracting Office Address

W07V ENDIST VICKSBURG VICKSBURG MS 39183 USA

Description

DESCRIPTION OF WORK:� The work consists of furnishing all plant, labor, materials and equipment for removing the existing concrete toe ditch with headwalls and reinforced concrete pipe, installing the new relief wells, demolishing the existing relief wells, and constructing the new concrete toe ditch with headwalls and reinforced concrete pipe.� Principal features of the work include mobilization and demobilization, concrete removal, demolition, excavation and backfill, control of water, concrete placement, grouted riprap placement, placement of graded stone, engineering fabric, installation of relief wells, erosion control, storm water pollution prevention, and environmental protection. PRE-BID CONFERENCE WILL BE HELD ON-SITE AT THE USACE FIELD OFFICE AT ARKABUTLA LAKE ON 14 JANUARY 2020 AT 10:30 AM, WITH A SITE VISIT TO FOLLOW. COORDINATES FOR THE FIELD OFIICE ARE 34�4647.87""N 90� 655.47""W.

Original Point of Contact

POC Andrew McCaskill, Phone: 601-631-5248, Dustin G. Cannada, Phone: 6016317546

Place of Performance

Address:
Hernando, MS 38632, USA
38632, USA
Link: SAM.gov Permalink
Bookmark This Notice
Print View