FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

Trail Bridge Materials

General Information

Document Type:PRESOL
Posted Date:Mar 04, 2020
Category: Lumber, Millwork, Plywood, and Veneer
Set Aside:N/A

Contracting Office Address

Boise National Forest BOISE ID 83709 USA

Description

A. DESCRIPTION OF WORK Furnish, fabricate, and treat structural timber, including all required yard lumber needed to render one complete glued?laminated stringer type trail bridge system having timber hand railing and running planks. Furnish all required anchoring/fastening hardware including but not limited to anchor bolts, lag screws, malleable iron washers, nails, plate washers, bearing shoes with elastomeric pads, and other structural steel as required to render a complete bridge system, delivered to the Bridge Site Location noted on the Drawings. B. DELIVERY Deliver the complete bridge system to the Bridge Site Location noted on the Drawings. The Bridge Site is located approximately 81 miles from Mountain Home, Idaho off of Interstate 84 via US Highway 20, Forest Road #61, and Forest Road #227. Coordinate material delivery with Braidy K. Richins at 208.731.0176 or by email at braidy.richins@usda.gov a minimum of 48 hours prior to delivery. Thursday and Friday deliveries are not permitted.

Original Point of Contact

POC Francis X. OConnor, Jr, Phone: 2083734279, Fax: 2083734197

Place of Performance

Address:
Mountain Home, ID 83647, USA
83647, USA
Link: SAM.gov Permalink
Bookmark This Notice
Print View