FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

DB Services for Underground Storage Tank (UST) Replacement at Sam Nunn AFC, ATL, GA

General Information

Document Type:PRESOL
Posted Date:Aug 21, 2020
Category: Prefabricated Structures and Scaffolding
Set Aside:N/A

Contracting Office Address

PBS R4 ACQUISITION MGMT DIVISION ATLANTA GA 30303 USA

Description

Amendment to�Solicitation #2 Questions and Response & supporting documents attached as of (8/21/20) .� To request structural drawings you will need to contact Project Manager at 404-431-0121 Shonda D. Piper=Cameron. links to O&M information along with Notice of Violation. - Attachments 36110, 3616, 6700,9176,8764,1202,5847 Amendment to RFP-#1 Site visit scheduled for this Thursday �8/13/20 at 10:30 by appointment only.� Limited Attendance due to COVID-19.�Everyone in attendance must wear a mask. � The contact person to call: Shonda D. Piper-Cameron, Project Manager @ 404-431-0121. ______________������������������������������������������������������������������������������������������������������������ To design the project to be most cost efficient. This design shall include, but not limited to all surveys, research, presentations, contract drawings, specifications, calculations and cost estimates necessary to complete this project. The Contractor shall fulfill the requirements necessary for the removal and disposal of the existing 10,000 gallon UST and the installation of a new double-walled, fiberglass tank(s) with overfill prevention, spill protection and fuel delivery system. Contractor will also install an appropriate fire protection system surrounding the tank(s) to ensure NFPA standards are met. Contractor shall provide all materials, equipment, tools, transportation, permits, disposal, construction documents and shop drawings (as required) to successfully complete the project.� Also, the contractor shall provide the coordination, labor, and qualified licensed supervision and insurance necessary to successfully complete the project. The work shall be designed and constructed in full compliance with the Georgia Environmental Protection Division (EPD) requirements, contract documents, scope of work document, specifications, and drawings, as well as, current national codes, regulations, and applicable trade standards, and GSA. �

Original Point of Contact

POC Rania S. Sanders, Phone: 4045773384, Wanda George-James, Phone: 4047728075

Place of Performance

Address:
Atlanta, GA 30303, USA
30303, USA
Link: SAM.gov Permalink
Bookmark This Notice
Print View