FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

MPYJ201636-BUID HEAT MITIGATION OUTDOOR FACILITY

General Information

Document Type:PRESOL
Posted Date:Sep 01, 2020
Category: Construction of Structures and Facilities
Set Aside:N/A

Contracting Office Address

FA3016 502 CONS CL JBSA LACKLAND TX 78236-5286 USA

Description

FA301620B0017-0002�- Amendment 02�to incorporate the updated provision 52.204-24 and the updated clause 52.204-25 into this solicitation. Please acknowledge receipt on the Standard Form 1442, Item 19 ""Ackowledge of Amendments"". ------------------------------------------------------------------------------------------------------------------------------------------------------------- Build Heat Mitigation Facility at Chapman Annex, Joint Base San Antonio, Texas -�This is a Design-Build Construction project. The objective of this project is to set out the requirements for the design and installation/construction of the Medina Ruck Track Heat Mitigation Immersion Bath/Elephant Shower Structure and electrical layout to the existing shades (Heat Mitigation Phase II). The structure is to be placed near the east side of the Medina Gym in order to efficiently access current electrical, water, and sewage infrastructure. The project is to performed at Joint Base San Antonio, Chapman Annex, Texas.

Original Point of Contact

POC Eli Walledelgadillo, Phone: 2106710474

Place of Performance

Address:
JBSA Lackland, TX 78236, USA
78236, USA
Link: SAM.gov Permalink
Bookmark This Notice
Print View