FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

Renovate specified areas within the gym located at Ft Bragg, NC

General Information

Document Type:AWARD
Posted Date:Sep 17, 2020
Category: Construction of Structures and Facilities
Set Aside:N/A

Contracting Office Address

US ARMY ENGINEER DISTRICT WILMINGTO WILMINGTON NC 28403-1343 USA

Description

Contract Award Date:         DTD 091720

Contract Award Number:    CNT W912PM20C0027

Contract Award Amount:     AMT 1232951.40

Contract Line Item Number: 

Contractor:     TO C&C CONTRACTORS, LLC Notasulga AL USAThe contractor shall renovate specified areas within the gym/physical therapy area�located within Building O190M at Ft Bragg.� The renovation will include removing the existing wall between spaces 3054 and 3056 and stairs and mezzanines within each space and the construction of a new second floor that spans both spaces. The renovation will create new first floor and second floor spaces within the project area. The new first floor area will contain 12 to 14 GFGI physical therapy tables about the perimeter of the space with a cabinet between each table. The new second floor will include a Storage space and an Office/Equipment space. The remaining open area within the new second floor will be used as a Recovery Space with GFGI chairs located within it. The project area will be designated for able-bodied only personnel but compliance with ADA regulations to the greatest extent practical is required.|**|TO C&C CONTRACTORS, LLC Notasulga AL USAThe contractor shall renovate specified areas within the gym/physical therapy area�located within Building O190M at Ft Bragg.� The renovation will include removing the existing wall between spaces 3054 and 3056 and stairs and mezzanines within each space and the construction of a new second floor that spans both spaces. The renovation will create new first floor and second floor spaces within the project area. The new first floor area will contain 12 to 14 GFGI physical therapy tables about the perimeter of the space with a cabinet between each table. The new second floor will include a Storage space and an Office/Equipment space. The remaining open area within the new second floor will be used as a Recovery Space with GFGI chairs located within it. The project area will be designated for able-bodied only personnel but compliance with ADA regulations to the greatest extent practical is required.|**|TO C&C CONTRACTORS, LLC Notasulga AL USAThe contractor shall renovate specified areas within the gym/physical therapy area�located within Building O190M at Ft Bragg.� The renovation will include removing the existing wall between spaces 3054 and 3056 and stairs and mezzanines within each space and the construction of a new second floor that spans both spaces. The renovation will create new first floor and second floor spaces within the project area. The new first floor area will contain 12 to 14 GFGI physical therapy tables about the perimeter of the space with a cabinet between each table. The new second floor will include a Storage space and an Office/Equipment space. The remaining open area within the new second floor will be used as a Recovery Space with GFGI chairs located within it. The project area will be designated for able-bodied only personnel but compliance with ADA regulations to the greatest extent practical is required.|**|TO C&C CONTRACTORS, LLC Notasulga AL USAThe contractor shall renovate specified areas within the gym/physical therapy area�located within Building O190M at Ft Bragg.� The renovation will include removing the existing wall between spaces 3054 and 3056 and stairs and mezzanines within each space and the construction of a new second floor that spans both spaces. The renovation will create new first floor and second floor spaces within the project area. The new first floor area will contain 12 to 14 GFGI physical therapy tables about the perimeter of the space with a cabinet between each table. The new second floor will include a Storage space and an Office/Equipment space. The remaining open area within the new second floor will be used as a Recovery Space with GFGI chairs located within it. The project area will be designated for able-bodied only personnel but compliance with ADA regulations to the greatest extent practical is required.

Original Point of Contact

POC Robert N Law, Phone: 9102514469, Michael Mullen, Phone: 9102514710

Place of Performance

Address:
Fort Bragg, NC 28310, USA
28310, USA
Link: SAM.gov Permalink
Bookmark This Notice
Print View