CBD-NET.com | Search | Subscribe to receive Updated Notices | Non-Print Version |
Document Type: PRESOL Posted Date: Oct 21, 2020 Category: Construction of Structures and Facilities Set Aside: N/A
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
THIS IS A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE AVAILABLE. THIS PROJECT IS BEING ADVERTISED ON A HUBZONE SET-ASIDE BASIS. PROJECT DETAILS:�AZ FLAP 62(1) King Canyon Trailhead This project consists of the construction and paving of a trailhead parking lot which will include approximately 30 parking stalls and two horse trailer stalls. Additional entrance improvements will be made to Kinney Road which include upgrading existing guardrail. The project is located near the Saguaro National Park at the King Canyon Trail within Pima County, Arizona. Anticipated Schedule The anticipated construction duration is from November�2020 to January�2021. Funding The estimated cost range is between $250,000 and $700,000.
POC Jorey Deml, Ryan Phillips
Address:
Tucson, AZ 85743, USA
85743, USA
Link: SAM.gov Permalink