FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

AZ FTNP CAGR 10(2) Entrance Road

General Information

Document Type:PRESOL
Posted Date:Oct 21, 2020
Category: Construction of Structures and Facilities
Set Aside:N/A

Contracting Office Address

6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA

Description

THIS IS A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE AVAILABLE. THIS WILL BE�A TOTAL SMALL BUSINESS SET-ASIDE PROCUREMENT Location:��Casa Grande National Monument Park County: Pinal, Arizona PROJECT DETAILS:��This project provides 3R rehabilitation treatment for routes to includes .65 miles of Entrance roadway. The rehabilitation project consists of pulverizing the existing asphalt for additional base and repaving with approximately 4� of asphalt. The project will also be addressing grading side slopes due to additional pavement thickness along shoulders.� Schedule A and Option X:� Significant Items for Schedule A Includes: .65 miles full depth reclamation of existing pavement, hot asphalt concrete paving -10,000 TONS, roadway aggregate-100 TONS and traffic control. Option X -Administration road includes: .12 miles full depth reclamation of existing pavement, hot asphalt concrete paving - 3,100 TONS, roadway aggregate, and traffic control.

Original Point of Contact

POC Jorey Deml, Sheri Walsh

Place of Performance

Address:
Coolidge, AZ 85128, USA
85128, USA
Link: SAM.gov Permalink
Bookmark This Notice
Print View