FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA

General Information

Document Type:PRESOL
Posted Date:Jan 25, 2021
Category: Construction of Structures and Facilities
Set Aside:N/A

Contracting Office Address

NAVAL FAC ENGINEERING CMD MID LANT NORFOLK VA 23511-0395 USA

Description

The project w ill repair project replaces 77 year old 50,000 gpm (gallons per minute) river w ater cooling system w ith new 8,200 gpm cooling tower with capability to reject heat up to 75 MMBH (Million British Thermal Units per Hour). Adequate cooling water system w ith capacity to cool up to 8,200 gallons of water per minute w ith heat rejection of up to 75 MMBH. Cooling water is required to support RDT&E mission performed in the Building 633 Complex, including test and evaluation (T&E) of Columbia Class Program Integrated Power System. The cooling water system needs to provide a reliable source of cooling water on demand, whenever required to support testing, w hile minimizing environmental impacts.

Original Point of Contact

POC Brittany Cristelli, Phone: 7573411978

Place of Performance

Address:
Philadelphia, PA, USA
, USA
Link: SAM.gov Permalink
Bookmark This Notice
Print View