FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 7,835 results were found for @Y in 0.053 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 2 of 392  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>
 
21. Z1qa--892-036 - miramar national cemetery expansion
36C786-20-B-0015� Cemetery Expansion Columbarium Niches, In Ground Cremains � Miramar. Project Number 892-036 Amendment 0001 - Posted to Vendor portal Amendment 0002 - Time extention and RFI answers. Amendment 0003 - Prebid RFI answers and three attac...
Type: PRESOL | Date: Aug 28, 2020 | Location: 22134 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
22. Lower hillside stabilization and park remediation
The work includes excavation of the lower hillside site to remove unstable soil and construction debris material and create graded area for parking construction of a retaining wall to stabilize soil upslope of excavated area, construction of approximately...
Type: PRESOL | Date: Aug 28, 2020 | Location: 74137-4290 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
23. Detroit river iwr storage building
Detroit River IWR Storage Building
Type: PRESOL | Date: Aug 28, 2020 | Location: 55437 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
24. Install vehicle denial barrier - morrell gate
Document Type: Pre-solicitation Notice Solicitation Number: W912QG-20-B-0003 Classification Code Y�Construction of Structures and Facilities Set-Aside: Total Small Business NAICS Code: 236220- Commercial and Institutional Building Construction The USPFO...
Type: PRESOL | Date: Aug 28, 2020 | Location: 29201-4763 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
25. 689-402 expand primary care - construction (va-19-00070477)
INTRODUCTION: The Department of Veterans Affairs (VA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single, Firm-Fixed-Price contract for the Construction Only Expand Primary Care Clinic, Newington VA...
Type: PRESOL | Date: Aug 28, 2020 | Location: 44131 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
26. Ks-flh indian hills well and pump
KS-FLH INDIAN HILLS WELL AND PUMP
Type: PRESOL | Date: Aug 28, 2020 | Location: 97232 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
27. Project relocate medical media (straddle project)
RELOCATE MEDICAL MEDIA PRE-SOLICITATION This project involves the remodel of rooms 7E111, 7E112, 7E112A, & 7E118A on the 7th floor of John L. McClellan Memorial Veterans Hospital, Little Rock, AR. This area is to be used by the hospital s Medical Medi...
Type: PRESOL | Date: Aug 28, 2020 | Location: 39157 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
28. Boxelder job corps center fire alarm improvements
The Boxelder Job Corps Center in Nemo, SD has a requirment to rehab and replace the fire alarms in multiple buildings.� Please see the attached documents.�
Type: PRESOL | Date: Aug 28, 2020 | Location: 80401 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
29. Fort gordon matoc idiq for minor construction, repair and alteration
Amendment 0006�- QUESTIONS AND ANSWERS, UPDATE TO SOW IN SOLICITATION� The Government has�posted the Final Round of Questions and Answers submitted.� Please see Amendment 0006 Summary of Changes for Additional Information. Brief overview of Import...
Type: PRESOL | Date: Aug 28, 2020 | Location: 30905-5719 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
30. Summersville paving
Contractor shall provide all necessary labor, equipment, and materials to Summersville Paving located at Summersville Lake, Summersville, WV in accordance with the attached Statement of Work
Type: PRESOL | Date: Aug 28, 2020 | Location: 25701-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
31. Asphalt placement carr creek lake
***** Amendment 0001 ***** An amendment has been posted. Please review. This amendment must be acknowledged in contractor submittals. The due date has not been extended. ***** Amendment 0001 ***** Contractor shall perform Asphalt Placement at Carr Creek L...
Type: PRESOL | Date: Aug 28, 2020 | Location: 40202-2230 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
32. Regional general construction with design build capabilities idiq mac
This Solicitation sets forth requirements for proposals for a firm fixed price Multiple-Award�Construction/Design-Build Indefinite Delivery Indefinite Quantity (IDIQ) contract to support�GSA�s Public Buildings Service (PBS), Greater Southwest Region...
Type: PRESOL | Date: Aug 28, 2020 | Location: 76102 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
33. Libby dam resource area well
This requirement is for the installation of a domestic water well for the Libby Dam Project, located in Libby, MT. Contractor shall provide all labor, materials and equipment in accordance with the Statement of Work in the attached solicitation.
Type: PRESOL | Date: Aug 28, 2020 | Location: 98134-2329 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
34. Pike island monolith r33 and rr34 river wall crack stabilization 2020
The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the repair and� stabilization of a crack within two concrete river wall monoliths at Pike Island Locks and Dam,� Ohio River, WV. The contract generally includes install...
Type: PRESOL | Date: Aug 28, 2020 | Location: 15222-4198 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
35. W9127820b0003 - mobile harbor, alabama, deepening and widening � phase 1
W9127820B0003 IFB
Type: PRESOL | Date: Aug 28, 2020 | Location: 36628-0001 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
36. Craney island sand reclamation dredging, cidmma portsmouth, va
08/25/2020 - Uploaded Amendment 0002 incorporating bidder inquiries and responses. Also, reminder to fill in clauses 52.204-24 and 52.204-26 when you acknowledge the amendment. 08/12/2020 - Uploaded Amendment 0001 providing site visit info and incorporati...
Type: PRESOL | Date: Aug 28, 2020 | Location: 23510-1096 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
37. 913-013 construction-ifb - san joaquin valley - cemetery expansion - kays (va-20-00056299)
PRE-SOLICITATION NOTICE: The Department Of Veterans Affairs, National Cemetery Administration intends to issue a solicitation entitled, The San Joaquin Valley National Cemetery, Cemetery Expansion Columbarium Niches, In Ground Cremains at, 32053 West McCa...
Type: PRESOL | Date: Aug 28, 2020 | Location: 22134 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
38. Jmtc-ri concrete trench fill-in
Please see attach Solicitaiton, Attachment 1 - SOW, and Attachment 2 - Princing Matrix. *CHANGE 1 -�8/14/2020 Closing date was changed to 28 Aug 2020 by Shavokie Gibson. *CHANGE�2 -�8/21/2020 Closing date was changed to 4�Sep 2020 by Shavokie Gibs...
Type: PRESOL | Date: Aug 28, 2020 | Location: 61299-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
39. Snake and elk creek utility tablese
The contractor shall provide all labor, materials, tools, equipment, manufactured utility tables and other items required to complete all contract tasks. The Contractor shall perform all tasks to the standards and specifications in this contract. Contract...
Type: PRESOL | Date: Aug 28, 2020 | Location: 74137-4290 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
40. This project consists of the demolition of the superstructure of building 12, foundation improvements, and construction of new gymnasium facility and additional storage area for 143 ces. the project will include all components and utilities.
Construct Gym work shall be performed in accordance with the plans and specifications. The project is being solicited as a Smal Business (SB) Set Aside.� The NAICS Code is 236220, and the SB Size Standard is $39.5M in average annual receipts for the pas...
Type: PRESOL | Date: Aug 28, 2020 | Location: 02852-7547 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
<< Previous  Page 2 of 392  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>