FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 3,946 results were found for @Y in 0.067 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 36 of 198  >> 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45   Next >>
 
701. Modifications to the converter compressor facility for sls block 1b, phase 1, john f. kennedy space center, florida
The Contractor shall furnish all management, supervision, labor, transportation, facilities, materials, tools, equipment, disposal, and documentation (except any property, including utilities, specified in the Schedule to be Government-Furnished) to perfo...
Type: PRESOL | Date: Feb 14, 2020 | Location: 32899 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
702. Tenant repairs, pease air national guard, newington, nh
The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under the project drawings and specifications. The project location is Building 145, Rooms 109-111 at Pease Air National Gua...
Type: PRESOL | Date: Feb 14, 2020 | Location: 01742-2751 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
703. Tenant repairs, pease air national guard, newington, nh
The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under the project drawings and specifications. The project location is Building 145, Rooms 109-111 at Pease Air National Gua...
Type: PRESOL | Date: Feb 14, 2020 | Location: 01742-2751 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
704. John h. kerr dam and reservoir right wing dike toe drain replacements
SOURCES SOUGHT NOTICE FOR John H. Kerr Dam and Reservoir Right Wing Dike Toe Drain Replacements This is a Sources Sought/Request for Information only. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligat...
Type: SRCSGT | Date: Feb 14, 2020 | Location: 28403 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
705. Construction of wind turbines at san clemente island (sci), naval base coronado, california
Description: THIS IS A SOURCES SOUGHT FOR SMALL BUSINESS CONCERNS ONLY. This is a Sources Sought Synopsis announcement for market research in support of the design-build construction project for Construction of Wind Turbines at San Clemente Island (SCI), ...
Type: SRCSGT | Date: Feb 14, 2020 | Location: 92132-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
706. $450m construction multiple award task order contract (matoc)
This is a sources sought announcement. This notice is for market research purposes only and IS NOT a request for proposal, quotation or bid. The Government will not reimburse respondents for any costs incurred in preparation of the response of this announ...
Type: SRCSGT | Date: Feb 14, 2020 | Location: 21201 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
707. Sources sought for small construction requirements in colombia and el salvador
MARKET RESEARCH and SOURCES SOUGHT NOTICE FOR SMALL CONSTRUCTION REQUIREMENTS IN COLOMBIA AND EL SALVADOR Market Research and Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on Indefini...
Type: SRCSGT | Date: Feb 14, 2020 | Location: 36628-0001 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
708. 593-ca-2202, boiler burner replacement department of veterans affairs va southern nevada healthcare system 6900 pecos rd, north las vegas, nv 89086 usa

Type: AWARD | Date: Feb 13, 2020 | Location: 20420 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
709. New well house - chittenden nursery, huron-maniste national forests

Type: AWARD | Date: Feb 13, 2020 | Location: 54501 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
710. Y--barrier replacement - st petersburg fl vba ro

Type: AWARD | Date: Feb 13, 2020 | Location: 20006 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
711. Ca flap cr 109(1), sir francis drake blvd. and point reyes roads

Type: AWARD | Date: Feb 13, 2020 | Location: 80228 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
712. Mvd levee requirements for fy20 and fy21
The intent of this special notice is to share the most current information available with respect to anticipated levee work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Dis...
Type: SNOTE | Date: Feb 13, 2020 | Location: 39183 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
713. Justification and approval to increase the total aggregate contract maximum of the navfacsw heavy horizontal construction macc by $91m
Approval for the use of other than full and open competition, to increase the total aggregate contract maximum of the NAVFAC Southwest Heavy Horizontal Construction MACC by $91,000,000, from $249,000,000 to $340,000,000 for all contracts combined was gran...
Type: SNOTE | Date: Feb 13, 2020 | Location: 92132-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
714. Justification and approval to increase the total aggregate contract maximum of the navfacsw heavy horizontal construction macc by $91m
Approval for the use of other than full and open competition, to increase the total aggregate contract maximum of the NAVFAC Southwest Heavy Horizontal Construction MACC by $91,000,000, from $249,000,000 to $340,000,000 for all contracts combined was gran...
Type: SNOTE | Date: Feb 13, 2020 | Location: 92132-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
715. Justification and approval to increase the total aggregate contract maximum of the navfacsw heavy horizontal construction macc by $91m
Approval for the use of other than full and open competition, to increase the total aggregate contract maximum of the NAVFAC Southwest Heavy Horizontal Construction MACC by $91,000,000, from $249,000,000 to $340,000,000 for all contracts combined was gran...
Type: SNOTE | Date: Feb 13, 2020 | Location: 92132-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
716. Justification and approval to increase the total aggregate contract maximum of the navfacsw heavy horizontal construction macc by $91m
Approval for the use of other than full and open competition, to increase the total aggregate contract maximum of the NAVFAC Southwest Heavy Horizontal Construction MACC by $91,000,000, from $249,000,000 to $340,000,000 for all contracts combined was gran...
Type: SNOTE | Date: Feb 13, 2020 | Location: 92132-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
717. Justification and approval to increase the total aggregate contract maximum of the navfacsw heavy horizontal construction macc by $91m
Approval for the use of other than full and open competition, to increase the total aggregate contract maximum of the NAVFAC Southwest Heavy Horizontal Construction MACC by $91,000,000, from $249,000,000 to $340,000,000 for all contracts combined was gran...
Type: SNOTE | Date: Feb 13, 2020 | Location: 92132-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
718. Justification and approval to increase the total aggregate contract maximum of the navfacsw heavy horizontal construction macc by $91m
Approval for the use of other than full and open competition, to increase the total aggregate contract maximum of the NAVFAC Southwest Heavy Horizontal Construction MACC by $91,000,000, from $249,000,000 to $340,000,000 for all contracts combined was gran...
Type: SNOTE | Date: Feb 13, 2020 | Location: 92132-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
719. Justification and approval to increase the total aggregate contract maximum of the navfacsw heavy horizontal construction macc by $91m
Approval for the use of other than full and open competition, to increase the total aggregate contract maximum of the NAVFAC Southwest Heavy Horizontal Construction MACC by $91,000,000, from $249,000,000 to $340,000,000 for all contracts combined was gran...
Type: SNOTE | Date: Feb 13, 2020 | Location: 92132-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
720. Runway repair/replacement offutt afb, ne
THIS IS NOT A REQUEST FOR PROPOSAL (RFP). The Offutt AFB Runway Repair/Replacement (FA8903-19-R-0063) was released to the Worldwide Engineering & Construction (WE&C) pool on�12�February 2020, with a proposal due date of 30�March 2020.�This...
Type: SNOTE | Date: Feb 13, 2020 | Location: 78236 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
<< Previous  Page 36 of 198  >> 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45   Next >>