FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 3,946 results were found for @Y in 0.028 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 5 of 198  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>
 
81. Fiber optic cable running b870 to 6 ebn dla at minot afb, nd
Provide all labor, tools, transportation, equipment, materials, supervision, and services to successfully furnish, install, and test (EFI&T) armored single mode Fiber Optic Cable (FOC) to upgrade fiber optic cable connectivity between Information Tran...
Type: PRESOL | Date: Mar 05, 2020 | Location: 58705 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
82. Fiber optic cable running b870 to 6 ebn dla at minot afb, nd
Provide all labor, tools, transportation, equipment, materials, supervision, and services to successfully furnish, install, and test (EFI&T) armored single mode Fiber Optic Cable (FOC) to upgrade fiber optic cable connectivity between Information Tran...
Type: PRESOL | Date: Mar 05, 2020 | Location: 58705 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
83. J017-ii utilities & site improvements phase ii main and commercial gates, us navsuppact marine corps base, guam
This project is for construction of a main gate and a commercial/tactical vehicle gate to provide installation security for Marine Corps Base Guam (MCBG) and meet Anti-Terrorism Force Protection and unified facilities criteria (UFC) requirements. Main gat...
Type: PRESOL | Date: Mar 05, 2020 | Location: 96860-3134 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
84. Castle rock picnic shelter
*** THE FULL SOLICITATION ESTIMATED ISSUE DATE:� Electronically uploaded to beta.SAM on or about March 23, 2020. *** The USDA, Forest Service, intends to acquire via a construction contract one new log picnic shelter at Castle Rock Campground, Hebo Rang...
Type: PRESOL | Date: Mar 05, 2020 | Location: 97331 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
85. Detroit arsenal construction matoc
The U.S. Army Garrison - Detroit Arsenal (USAG-DTA) Directorate of Public Works (DPW) has a continuous need for a broad range of design-build and design-bid-build construction capability to support real property sustainment, restoration, modernization, re...
Type: PRESOL | Date: Mar 05, 2020 | Location: 48397-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
86. Wpafb fire/crash rescue station
Design/Bid/Build for Fire/Crash Rescue Station at Wright Patterson Air Force Base (WPAFB), OH. Estimated Construction Cost is between $5,000,000 and $10,000,000. NAICS code is 236220. Size determination is $39.5M. Please note that business size in the Sys...
Type: PRESOL | Date: Mar 05, 2020 | Location: 40202-2230 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
87. Road construction idiq - amendment 1
The US Forest Service has a requirement for Road Construction Indefinite Delivery/Indefinite Quantity (IDIQ) on the Savannah River Site located 10 miles east of Aiken, South Carolina.� The Savannah River Site is a restricted government site under the co...
Type: PRESOL | Date: Mar 05, 2020 | Location: 29212 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
88. Spect/ct site preparation two-phase design build project charlie norwood vamc (downtown) augusta, georgia
Page 1 of 1 INTRODUCTION: The Department of Veterans Affairs (VA), Program Contracting Activity Central (PCAC) anticipates soliciting proposals and subsequently awarding a single, Firm-Fixed-Price contract using DESIGN-BUILD selection procedures for a SPE...
Type: PRESOL | Date: Mar 05, 2020 | Location: 44131 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
89. Pendills creek nfh influent water pipeline
PROJECT LOCATION: U.S. Fish & Wildlife Service, Region 3, Pendills Creek National Fish Hatchery, Chippewa County, Michigan ESTIMATED MAGNITUDE: The magnitude of this requirement in terms of physical characteristics and estimated price range is between...
Type: PRESOL | Date: Mar 05, 2020 | Location: 55437 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
90. Sound prooof windows replacement
This is a competitive small business set aside invitation for bid/proposal.� The acquisition is subject to the North American Industry Classification System (NAICS) code of 238990 with small business set aside standard of 500 personnel.� The magnitude...
Type: PRESOL | Date: Mar 05, 2020 | Location: 20593 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
91. Macarthur lock tainter valve machinery replacement
This project will be a replacement of the mechanical drive system, excluding the motor (prime mover), used to operate the four (4) filling and emptying tainter valves on the MacArthur Lock. The replacement includes, but is not limited to: strut assembly, ...
Type: PRESOL | Date: Mar 05, 2020 | Location: 48226-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
92. Repair circuits 2/3, sheppard afb, tx
Circuits 2/3, Sheppard AFB, TX This is a tw o-phase competitive bid solicitation for a firm, fixed-price contract. It w ill be aw arded using the Best Value Trade-Off process.� The preliminary scope of this contract includes, but is not limited to, desi...
Type: PRESOL | Date: Mar 05, 2020 | Location: 74137-4290 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
93. Moc asphalt crack and seal
NOTE: All responses to this RFQ shall be emailed to Benjamin Siltman at siltman@wapa.gov. The Western Area Power Administration, Rocky Mountain Region has a requirement for a contractor to provide all the labor, materials, tools, equipment, transportation...
Type: PRESOL | Date: Mar 05, 2020 | Location: 80538 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
94. Construction of the human engineering lab - soldier squad performance research institute (s2print), natick soldier systems center, natick, ma
An organized site visit has been scheduled for-- Wednesday, 18 March 2020 at 10:00AM Participants will meet at-- Natick Solider Systems Center General Greene Avenue, Natick, MA 01760 -Contractors shall not take any photos while on base. -All vistors will ...
Type: PRESOL | Date: Mar 05, 2020 | Location: 01742-2751 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
95. Construction of the human engineering lab - soldier squad performance research institute (s2print), natick soldier systems center, natick, ma
IMPORTANT NOTE:�We are currently having technical issues uploading the Specifications . The Specifications will be forthcoming. An organized site visit has been scheduled for-- Wednesday, 18 March 2020 at 10:00AM Participants will meet at-- Natick Solid...
Type: PRESOL | Date: Mar 05, 2020 | Location: 01742-2751 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
96. Sof assessment and selection training complex
This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and ...
Type: PRESOL | Date: Mar 05, 2020 | Location: 28403-1343 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
97. Sof assessment and selection training complex
This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and ...
Type: PRESOL | Date: Mar 05, 2020 | Location: 28403-1343 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
98. Sources sought notice | dalecarlia clearwells maintenance and improvements, washington aqueduct division, washington, dc
Responses are due no later than 1:00 p.m. eastern standard time March 19, 2020.� This is a Sources Sought Notice and is for informational/ market research purposes only.� THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS.� The U.S. Army Corps ...
Type: SRCSGT | Date: Mar 05, 2020 | Location: 21201-2526 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
99. Sources sought notice | dalecarlia clearwells maintenance and improvements, washington aqueduct division, washington, dc
Responses are due no later than 1:00 p.m. eastern standard time March 19, 2020.� This is a Sources Sought Notice and is for informational/ market research purposes only.� THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS.� The U.S. Army Corps ...
Type: SRCSGT | Date: Mar 05, 2020 | Location: 21201-2526 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
100. Provo area office parking lot replacement
The purpose of this amendment to the sources sought is to correct the title of the NAICS code in the attached description from ""Manufactured Home (Mobile Home) Manufacturing"" to ""Highway, Street, and Bridge Construction""
Type: SRCSGT | Date: Mar 05, 2020 | Location: 84138 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
<< Previous  Page 5 of 198  >> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20   Next >>