FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 6,540 results were found for @Y in 0.309 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 15 of 327  >> 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24   Next >>
 
281. P169 nmc ordnance facilities recapitalization, yorktown, va
DESIGN-BID-BUILD, P169 NMC ORDNANCE FACILITIES RECAPITALIZATION, NAVAL WEAPONS STATION, YORKTOWN, VIRGINIA
Type: PRESOL | Date: Dec 14, 2020 | Location: 23511-0395 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
282. Wa jeff 91420(1), upper hoh river road phase 2
Bid documents�
Type: PRESOL | Date: Dec 14, 2020 | Location: 98661 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
283. Advance notice - mobile harbor, alabama, deepening and widening � phase 3
THIS PROJECT IS ADVERTISED ON AN UNRESTRICTED BASIS THIS PROJECT IS A STAND-ALONE �C� TYPE INVITATION FOR BID (IFB) SOLICITATION. THE NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE FOR THIS PROJECT IS 237990. The �size standard is $30.0M...
Type: PRESOL | Date: Dec 14, 2020 | Location: 36628-0001 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
284. Modular firing range, columbus afb, ms
See attachments.�
Type: PRESOL | Date: Dec 14, 2020 | Location: 36628-0001 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
285. 549-sl-139 repair roof building 2j
Amendment to add updated SOW that contains pictures of the added areas and extend the quote due date to January 4 2021
Type: PRESOL | Date: Dec 14, 2020 | Location: 76006 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
286. W912p521b0004 - loyall ponding phase 1
PURPOSE: The Nashville District U.S. Army Corps of Engineers (USACE) intends to issue an Invitation for Bid (IFB) solicitation for a firm fixed price construction contract for the Loyall Ponding Phase 1 project located in the City of Loyall, KY in Harlan ...
Type: PRESOL | Date: Dec 14, 2020 | Location: 37203-1070 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
287. Roof replacement
Replace the existing asphalt shingle roof at the National Weather Service (NWS) Forecast Office in Calera AL with a baked enamel standing seam steel metal roof.� Please see the attached Solicitation and Statement of Work (SOW) for more information. This...
Type: PRESOL | Date: Dec 14, 2020 | Location: 98115 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
288. W9127820q0011 electric access gates, lake lanier, ga
Requirement for Electric Arm Access Gates at Lake Sidney Lanier, Gwinnett & Forsyth Counties, Georgia. This project includes, but is not limited�to: construction and installation of electric arm access gates and entry keypads, steel posts, concrete ...
Type: PRESOL | Date: Dec 14, 2020 | Location: 36628-0001 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
289. Motco access control point (acp) gate 1
****Amendment 5�extended the proposal due date, extended the time to post questions,�posted revised specs and drawings with narrative and added option clins.**** *****Amendment 4 posted updated specifications and drawings with narrative of changes.***...
Type: PRESOL | Date: Dec 14, 2020 | Location: 95814-2922 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
290. P3003, consolidated communication center, aafb
This�project consists of constructing a consolidated communications center (approximately 80,000 SF) utilizing economical design and construction methods to accommodate the mission of the facility. Construction includes a concrete foundation, structural...
Type: SRCSGT | Date: Dec 14, 2020 | Location: 20374-5018 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
291. Matoc request for proposal for task order request number w912hn-15- r0808, bragg airfield matoc w912hn-15-r-0008 - project numbers fa-80001-20 & fa- 80002-20, fort bragg, nc

Type: AWARD | Date: Dec 11, 2020 | Location: 31401-3604 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
292. 561-18-125 replace both 900-ton chillers (va-21-00003265)

Type: AWARD | Date: Dec 11, 2020 | Location: 12208 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
293. Matoc request for proposal for task order request number w912hn-15- r0808, bragg airfield matoc w912hn-15-r-0008 - project numbers fa-80001-20 & fa- 80002-20, fort bragg, nc

Type: AWARD | Date: Dec 11, 2020 | Location: 31401-3604 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
294. Dla aviation operations center, phase ii, defense supply center richmond (dscr) (amendments: 1, 2, 3, 5, 6, and 7)

Type: AWARD | Date: Dec 11, 2020 | Location: 23510-1096 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
295. Sitework and paving idiq at hanscom afb

Type: AWARD | Date: Dec 11, 2020 | Location: 01731-2107 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
296. This special note is to notify presolicitation notice 36c24420r0084 595-667 expand laboratory construction has replaced by 36c24421r0018.
Solicitation 36C24421R0018 has been posted to Beta.Sam and proposals are due 1/7/21. A pre-proposal site visit is scheduled for 12/14/20 at 11:00 AM. See solicitation for details. There will not be a solicitation posting under previous Contract Opportunit...
Type: SNOTE | Date: Dec 11, 2020 | Location: 15215 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
297. 36c24420r0084 is cancelled and replaced by solicitation 36c24421r0018 which is posted in beta.sam
This solicitation 36C24420R0084 is cancelled and replaced by 36C24421R0018.
Type: SNOTE | Date: Dec 11, 2020 | Location: 15215 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
298. Design-build construct fire and rescue station, stefan voda, moldova
D-B Construct Fire and Rescue Station, Stefan Voda, Moldova See Attachments (9 total)
Type: MOD | Date: Dec 11, 2020 | Location: 09622-0051 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
299. Levee rehab-platte county 1, rushville sugarlake, missouri
The U.S. Army Corps of Engineers, Kansas City District, has a need for Construction Activities for Levee repair to the Rushville Sugar-Lake and Platte County Drainage District No. 1 Levee Units due to damages sustained during the 2019 flood events. The wo...
Type: MOD | Date: Dec 11, 2020 | Location: 64106-2896 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
300. Nrm: 640a4-21-905 remove bulk oxygen storage bldg.62
Remove Bulk Oxygen Storage Tanks
Type: MOD | Date: Dec 11, 2020 | Location: 95655 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
<< Previous  Page 15 of 327  >> 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24   Next >>