FedBizOpps banner

Login to begin searching the FBO/CBD
Home Page
CBD/FBO Online
CBD/FBO Email
About Us
Contact Us
Privacy
Categories
No. Notes
Archives
Search
Help
Login
Register

Popular Searches

Popular Categories

RESTRICTED SEARCH This search is restricted to data that is at least 30 days old.
To access current data, please click here to register for unrestricted service.

Search:  Search Help - Browse Categories
From: To:    Type:  
Found 2,933 results were found for @Y in 0.066 seconds.   Click here to save to my search profile.
You Searched in Categories:

<< Previous  Page 15 of 147  >> 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24   Next >>
 
281. Kuwait job order contract (joc) pre-solicitation conference
Title: Pre-Solicitation Conference for the Kuwait Job Order Contract (JOC), Solicitation Number W912ER19R0004 NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS...
Type: SNOTE | Date: Mar 15, 2019 | Location: 22602-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
282. Us army corps of engineers, kuwait industry day
Title: US Army Corps of Engineers, Middle East District Industry Day Event - Kuwait City, Kuwait NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON ...
Type: SNOTE | Date: Mar 15, 2019 | Location: 22602-5000 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
283. Single source notification - alabama power company for the installation of new power feed and utility connection for the rtr and glide slope at the mobile regional airport, mobile, al
In accordance with Federal Aviation Administration (FAA) Acquisition Management Systems (AMS) Policy Section 3.2.2.4, the purpose of this announcement is to inform industry of the FAAs decision to contract on a single source basis with Alabama Power Compa...
Type: SNOTE | Date: Mar 15, 2019 | Location: 20591 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
284. Heyburn lake upstream embankment repair
The sources sought notice for the Heyburn Lake Upstream Embankment repair project is hereby canceled. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEE...
Type: MOD | Date: Mar 15, 2019 | Location: 74137-4290 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
285. Replace perimeter fencing at ddjc tracy
Action Code: Presolicitation Notice NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov...
Type: MOD | Date: Mar 15, 2019 | Location: 95814 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
286. Ft. peck install high resistance grounding
POSTING OF SOLICITATION WITH SUPPORTING DOCUMENTS: 15 MARCH 2019 @ 925 AM CT NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CO...
Type: MOD | Date: Mar 15, 2019 | Location: 68102-4901 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
287. Af targeting center
The acquisition approach is to solicit for a competitive Single Award stand-alone construction contract using full and open competition. The basis of award will use the Best Value Trade-off process, as authorized by FAR 15.101-1. Award will be made to the...
Type: MOD | Date: Mar 15, 2019 | Location: 23510-1096 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
288. Chincoteague bay channel dredging
ProjNet Bidder Inquiry Submission Period is hereby extended from 22 March 2019 to 8 April 2019 at 02:00 PM EDT. Bid Opening date is not extended and remains 15 April 2019 at 02:00 PM EDT. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATE...
Type: MOD | Date: Mar 15, 2019 | Location: 23510-1096 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
289. Construction of a new compound semiconductor lab/microsystem integration facility (csl/mif) for mit lincoln laboratory (mit ll) located at hanscom air force base (hafb) in lexington, massachusetts
NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
Type: MOD | Date: Mar 15, 2019 | Location: 01742-2751 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
290. Construction of a new compound semiconductor lab/microsystem integration facility (csl/mif) for mit lincoln laboratory (mit ll) located at hanscom air force base (hafb) in lexington, massachusetts
The U.S. Army Corps of Engineers, New England District has issued a Tradeoff, Best-Value, Request for Proposals for MIT Lincoln Laboratory (MIT LL) for the construction of a new Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF) located...
Type: MOD | Date: Mar 15, 2019 | Location: 01742-2751 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
291. Alterations to 4th floor partnership building v orlando, fl
NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
Type: MOD | Date: Mar 15, 2019 | Location: 36628-0001 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
292. Unaccompanied enlisted personnel housing, soto cano air base, honduras
NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
Type: MOD | Date: Mar 15, 2019 | Location: 36628-0001 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
293. Clc construction. canandaigua va medical center located in canandaigua, new york
DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (RFP) W912QR-19-R-0002 for the construction of a new 120 bed Community Living Center (CLC) complex and a Community Center (138,392 square fee...
Type: MOD | Date: Mar 15, 2019 | Location: 40201-0059 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
294. Fy19 combat rescue helicopter simulator building
NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
Type: MOD | Date: Mar 15, 2019 | Location: 90017-3401 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
295. Fy19 italy design-build (db) / design-bid-build (dbb) construction matoc
***Changes dated 15 March 2019 All interested parties are advised to carefully review all changes made today under items 3 and 4 under the section below titled PRE-QUALIFICATION PROCESS. PURPOSE OF THIS ANNOUNCEMENT This announcement has two purposes. Fir...
Type: MOD | Date: Mar 15, 2019 | Location: 65187 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
296. Pl 84-99 rehab [kingstree, saw mill, turkey creek]
**SOLICITATION-INVITATION FOR BID-SOLICITATION** PROJECT TITLE: FY19 Post Joaquin Project Rehabilitation: Kingstree, Saw Mill, and Turkey Creek NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVE...
Type: MOD | Date: Mar 15, 2019 | Location: 29403-5107 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
297. Sources source for small business only: modernization and expansion of the calexico west port of entry phase 2a, calexico, california
NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
Type: MOD | Date: Mar 15, 2019 | Location: 94102-4912 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
298. Department of state 2018 design-build construction contract for camp alvarado phase iii kabul, afghanistan upgrades and replacement project
THIS REQUIREMENT HAS BEEN CANCELLED EFFECTIVE MARCH 15, 2019 NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-37...
Type: MOD | Date: Mar 15, 2019 | Location: 22209 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
299. Department of state 2018 design-build construction contract for camp alvarado phase iii kabul, afghanistan upgrades and replacement project
THIS REQUIREMENT HAS BEEN CANCELLED EFFECTIVE MARCH 15, 2019. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3...
Type: MOD | Date: Mar 15, 2019 | Location: 22209 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
300. Big four boardwalk
SOLICITATION ISSUANCE STATUS : This special notice serves the purpose of the required 15-day presolicittion notice as required by the Federal Acquisition Regulation. The FBO Notice is modifided as detailed below. PROJECT DESCRIPTION : The Forest Service i...
Type: MOD | Date: Mar 15, 2019 | Location: 98201 | Bookmark
Category: (Y) Construction of Structures and Facilities

 
<< Previous  Page 15 of 147  >> 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24   Next >>